Homeowners ask how long the panels take to put on the roof. That is the wrong question, and it is why so many solar projects feel like they stalled. A grid tied solar installation is mostly paperwork and permissions with a day or two of roof work in the middle. The array can be fully installed, wired and weathertight and still be legally switched off, waiting on a piece of correspondence.

Knowing the sequence before you sign changes the conversation with every contractor you talk to, because you will be asking about the steps that actually control the date.

What a grid tied solar installation has to clear before it switches on

There are four approvals, they run partly in parallel, and each one can send you back a step.

The interconnection application. This goes to your electric utility and it asks permission to put power onto their distribution system. The utility reviews the equipment, the system size and the circuit it will feed. On a straightforward residential system this is a review rather than a study, but the review is a queue and the queue has a length.

The building and electrical permit. This goes to the local authority having jurisdiction, which for central Ohio homeowners is the city or the county depending on where the house sits. It covers the electrical work and, on most roof mounts, a structural check of the array’s load on the framing.

The inspection. A physical inspection after installation and before the system is allowed to run. Fail it and you are rescheduling, not fixing on the spot.

Permission to operate. The final letter or notice from the utility saying you may energise. Almost nobody expects this step and it is routinely the one that adds weeks. Until it arrives, an otherwise finished array stays off.

A meter exchange often sits inside that last step, because the billing arrangement for exported power needs a meter that measures in both directions.

The roof decides more than the panels do

Before any of the above, the roof gets a hard look, and this is where honest contractors lose sales to optimistic ones.

Array life is measured in decades. If the roof has under ten years left, the panels come off and go back on when it is replaced, and that is a cost nobody wants to meet twice. Replacing the roof first is almost always the cheaper sequence.

Framing matters too. Older Ohio homes with true dimensional lumber usually take an array without difficulty. Some later trussed roofs need the loads checked before anything is fastened.

Then orientation and shading. South facing planes produce most, east and west less, and north facing planes rarely justify panels at all. Shading is the harsher constraint, because a single tree that clips the array for two hours in the afternoon can cost more production than the orientation does. Ask for a shade analysis of the actual roof rather than a generic estimate for the region.

The electrical side that quotes skip

The array connects to the house through the main service panel, and that connection is bounded by the Code. A backfed solar breaker feeds current onto the bus from the opposite end to the main, and the Code limits the main breaker and the backfed breaker together against what the bus is rated to carry. A panel that seems to have room may not accept the solar breaker at all.

Three answers exist: derate the main breaker, connect on the supply side ahead of the main, or replace the panel. Which one applies depends on your panel, and it is worth settling before the contract rather than as a change order. Our electrical panel work is often the first step of a solar project rather than an extra.

Rapid shutdown is the other requirement worth knowing by name. The Code requires that the conductors on the roof can be de-energised quickly for firefighters, which is handled either with microinverters or with module level electronics on a string system. It affects equipment choice, and it is not optional.

If a battery or a standby generator is anywhere in your plans, say so now. Backup power changes the wiring topology because the loads you want backed up have to be separated onto their own panel, and retrofitting that later means opening work you have already paid for. The trade-offs between the two are covered in our comparison of battery backup and a standby generator.

Sizing, and why bigger is not automatically better

The billing arrangement for exported power in Ohio is set by your utility under state rules, and the terms of that arrangement decide whether a system that produces more than you use is worth building. This is the single most important question to put to a solar contractor, and the answer should be specific to your utility rather than a general statement about solar.

Design starts from your actual consumption. Twelve months of usage history, not an average, because winter and summer look nothing alike in central Ohio. From there the design accounts for roof area, orientation, shading and the equipment. A proposal that starts from a system size rather than from your usage has the logic backwards.

Ohio weather is not the obstacle people assume. Panels produce in cold conditions, and in fact run more efficiently at lower temperatures. Snow cover matters, and so does the flatter winter sun angle, which is exactly why the design is based on a full year rather than a good month.

What a good solar proposal contains

It should name the modules and the inverters by manufacturer and model, not by wattage class alone. It should show the array layout on your roof, with the shading accounted for. It should state the production estimate for a full year and name the assumptions behind it. It should say what happens at the main panel, in words, including whether a derate, a supply side connection or a panel replacement is required. It should list the permits and the interconnection application as separate line items with who files each. It should state the warranty terms for the modules, the inverters, the racking and the workmanship separately, because they are different lengths. And it should be honest that permission to operate is outside the contractor’s control.

If you want that kind of assessment on a central Ohio home, start at the contact page. The solar installation and electrical departments do the roof and the panel walkthrough together, and the load side of the same question is covered in our guide to panel capacity for electrification.

Frequently asked questions

How long does a grid tied solar installation take from signing to switch on?

The physical installation is usually one to three days for a residential roof mount. Everything else is approvals: the interconnection application with your utility, the building and electrical permit, the inspection, and finally permission to operate. Those run in weeks rather than days and they are not fully under a contractor’s control. Ask any bidder for their recent experience with your specific utility and your specific jurisdiction rather than for a generic timeline.

Do solar panels work in Ohio winters?

Yes, and the cold itself is not the problem. Photovoltaic modules are more efficient at lower temperatures, so a clear cold day is good production weather. What reduces winter output is the shorter day, the lower sun angle and snow sitting on the array. That is why an honest design is built from a full year of production modelling and a full year of your own usage, not from a summer month.

Will my roof need replacing before solar goes on?

If it has less than about ten years of life left, replace it first. An array lasts decades, and taking panels down and putting them back to reroof underneath is work you pay for twice. A contractor who does not raise the roof’s age and condition before quoting is not looking hard enough.

Does adding solar mean I can run my house during an outage?

Not on its own. A standard grid tied system shuts down when the grid goes down, which is a safety requirement so that it cannot energise lines that utility crews are working on. Running through an outage needs battery storage with the right inverter, or a generator, and the loads you want backed up have to be wired onto a separate panel. Decide this before installation, because retrofitting it means reopening finished work.

Why can my system be finished but not turned on?

Because permission to operate is a separate step from installation and inspection. The utility issues it after its own review is complete, and a meter exchange is often part of it. An array can be fully installed, inspected and weathertight while that notice is still outstanding. It is normal, it surprises almost everyone, and it belongs in the schedule conversation at the start rather than at the end.

Scroll to Top
1,000+ Verified Reviews
⭐⭐⭐⭐⭐ See what Ohio homeowners say
View All →

⚡ Electrical Reviews

📍 Central Columbus
★★★★★

“Matt & Dave were awesome! We had multiple light fixtures/ceiling fans we needed to update and they were professional and great about answering all of my questions and educating me along the way.”

— Tiffany Luckhaupt
📍 Delaware
★★★★★

“Had the electrical panels replaced in my home. Seth and his team were on time, courteous and did an excellent job in a very professional manner. Seth triple checked their work, fixed all issues in this 1980’s wired home and was so helpful. I was really impressed. R&T is my only company for electrical needs!”

— Scott Stevenson
📍 Dublin
★★★★★

“What a great experience with R&T Yoder Electric. From our estimator, Chase, to our installation crew, Jason and Aaron, we couldn’t be happier. Everyone was on time and the work completed professionally. We would highly recommend R&T Yoder Electric to anyone needing assistance with electrical projects in their home.”

— Brett Wingart
📍 Gahanna
★★★★★

“Chase came out to take a look at some work being suggested by a different electrician on our panel and one circuit. I really appreciated his thorough and transparent visit today as he looked over some of the issues we have been having…”

— Conor
📍 Grove City
★★★★★

“First time using Yoder Electric and technician Evan Freitas to change batteries in 7 smoke detectors. Evan was very personable. He explained that while regularly changing the batteries is always an option, I might want to consider…”

— Linda Rhoades
📍 Hilliard
★★★★★

“Very thankful to have your company help take care of the problem. My brother was in desperate need to have the electric fixed to be able to use his hospital bed. And able to use his recliner. He was so happy with the…”

— Linda Stump
📍 London
★★★★★

“These guys figured out my issues FAST! For transparency, I had another electrician come out a couple weeks prior who was here for almost 8 hours and still didn’t figure out why my four outlets weren’t working. Evan clocked it immediately…”

— Sarah Thomas
📍 Marysville
★★★★★

“Installation of electrical services in our basement completed within 1 day. Efficient, knowledgeable, and great customer service. Easy to work with and didn’t make a huge mess! Very tidy and clean work. Would recommend Evan for future jobs as well as R & T Yoder electric.”

— Al Salah
📍 Pickerington
★★★★★

“Had a new foyer chandelier installed in a 2 story foyer. Very pleased with the installation! Matt DeVore and Andrew Hudson did a great job and were very professional. We would definitely use this company again for any electrical work we need done.”

— Janet Herring
📍 Plain City
★★★★★

“Micah and team did a great job on our entire house outlet/light switch replacement/update and our panel box replacement (NW Columbus). Punctual, knowledgeable, competent, polite and great customer service. It was scheduled as a one and a half day job and that is exactly what it took. Yoder is my go-to electrician without a doubt.”

— Ed H.
📍 Reynoldsburg
★★★★★

“Absolutely the best electrician I have dealt with. John Snook came to our home and handled our breaker and water heater with no issues. Respectful of our home and time. Thank you John and Thank you R&T Yoder. You need an electrician this is the place to call.”

— Balinda Cole
📍 Westerville
★★★★★

“Guys did a great job. And quote was literally 60% less than one of the “big name” Columbus electrician outfits that drives vans around with a bear on it.”

— Nathan Arnett

🔧 Plumbing Reviews

📍 Columbus
★★★★★

“Very satisfied Cameron Rung our Service Tech was prompt, thorough, and courteous. We will definitely be using your services in the future and passing your name to family and friends. Cameron solved and our 1 year problem in just a few hour’s very awesome 👌”

— Rick Naus
📍 Delaware
★★★★★

“Brian Brown was the best! Very knowledgeable and patient answering all of our questions. He was quite persistent in finding a lid for our 20 yr old ejector pit in the unfinished half bath in the basement. The wrong size was sent by the…”

— Nancy HJohns
📍 Dublin
★★★★★

“Cameron Rung did an amazing job! He really knows his stuff and explained everything in a way that was easy to understand. I could tell he paid attention to the details and made sure everything was done right. Super helpful, professional,…”

— Michael Boes
📍 Plain City
★★★★★

“Very efficient and professional work, same-day water heater replacement, patient and courteous every step of the way. Chris and Patrick did an excellent job.”

— Seth Knaebel
📍 Springfield
★★★★★

“Cameron, Sam and Chris came in and knocked out the job with minimal stress. They helped lift a stress off My Family’s back and I can’t thank them enough. We will absolutely be calling again if anything comes up in our home going forward, it’s hard to find an honest crew like this one!”

— Nicholas Wheeler

❄️ HVAC Reviews

📍 Columbus
★★★★★

“R&T Yoder is an excellent company for all your electrical and hvac needs. I’ve never used their plumbing service as yet. They are always on time, they call before they come. Zack was very knowledgeable concerning my furnace and heat pump.…”

— sheila Gressett
📍 Dublin
★★★★★

“Fantastic overall experience provided the R & T Yoder HVAC team! Jace and Danny insured our installation was completed and tested. Thank you as well to Tech Jonathan for the home visit prior to our repairs. Outstanding team work!”

— Harold Roskoski
📍 Plain City
★★★★★

“Very friendly, punctual, professional, respectful of property. Very knowledgeable and answered any questions I had and took the time to help me with the Ecobee thermostat app. I love the 2 stage furnace. There’s no blast of hot air. It…”

— Scarlett